Basement Epoxy Flooring Starts With A Moisture Test
A basement slab sits against the ground, so moisture can rise through it. Lethbridge air is very dry, but water still reaches the soil under slabs from lawn sprinklers, downspouts and the silty ground the city is built on.
Every basement gets a moisture reading first. A high number calls for a vapour blocking primer, and that one change is what stops bubbles from showing up a year later.
Basement Epoxy Flooring Colours And Finishes
Solid colours, flake blends and metallics all work downstairs. Flake hides lint, scuffs and chalk dust, so it suits a laundry room or gym. A solid grey looks tidy in a storage room. For a rec room that should feel finished, our metallic epoxy flooring gives a glossy, swirled look.
In a home gym, we can leave room for rubber mats where weights get dropped.
Basement Epoxy Flooring Cost In Lethbridge
Most basements come in at $5 to $9 a square foot. A vapour blocking primer or crack repair adds to that. Basements in older South side homes usually need more crack repair than newer homes in West Lethbridge.
Basement Epoxy Flooring Over Cracks And Old Patches
Most basement slabs have shrinkage cracks, and older homes often have patches where plumbing was moved. We fill both before coating. Hairline cracks can still show as fine lines, and we tell you that before you choose. Wider cracks are cut open and filled so they stay flat.
Basement epoxy flooring cannot fix a slab that is heaving. If we see signs of that, we will say so before any work is booked.
Basement Epoxy Flooring Around The Floor Drain
Nearly every Lethbridge basement has a floor drain, usually by the furnace or the laundry. We coat right up to it and seal the edge, so water runs into the drain instead of under the coating. Low spots that send water the wrong way can be built up first, so a leaking washer or water heater drains where it should.
Living On A Coated Basement Floor
Coated concrete is firmer than carpet, so area rugs suit the sitting areas. Felt pads keep chair legs from scuffing the top layer. A dehumidifier, a sump pump or a chest freezer can all sit on basement epoxy flooring without harm.
Basement Epoxy Flooring Timeline
Most basements take two to three days. Day one is grinding and crack repair, with plastic taped over the stairway to keep dust out of the house. Day two is primer and colour, and day three, when needed, is the clear top layer.
You can walk on the new floor after about a day and move furniture back after three. The odour is mild with the products we use indoors, and a fan venting outside clears it quickly.